ECO-CENTS ABANDONMENT SOLUTIONS

Abandonment, Abandonment Trailer, Oilfield Abandonment, Well Services, Well Abandonment Services, Well Abandonment Procedures, Abandonment oil and gas wells, plug and abandonment jobs, energy abandonment

PATENT PENDING TECHNOLOGY

Cost Efficient Alternative Solution to Downhole Abandonments

ECO-CENTS ABANDONMENT SOLUTIONS

Rock Solid introduces our newly designed Eco-Cents Abandonment Solutions Trailer (ECAS Trailer) used to provide a one-stop-shop for down hole abandonments. The trailers were engineered/designed to promote T-Rock CT Services small body job units to increase utilization. Since then we have realized the value created to customers by providing large cost savings on abandonments which only have a negative return on investment (ROI).

T-Rock CT Services Ltd has the ability to work for all government abandonment programs: Orphan Wells Association - all provinces, Alberta Site Rehabilitation Program, Saskatchewan Accelerated Site Closure Program and British Columbia Dormant Sites Reclamation Program.

The ABANDONMENT TRAILERS were originally designed to offer a cost savings alternative to abandoning wells for producers as well as increase T-Rocks small CTU utilization. The trailers offer an effective alternative to abandoning wells that would otherwise require a service rig or wireline unit. This approach eliminates the need for cementers, fluid haulers (on small cement batch applications), and tool hands on site.

The Abandonment Trailers are run in unison with a coil tubing unit (CTU) and provide the following tools and services:

  • Two Hydraulically ran Mixing Barrels (300L volume per barrel)

  • PCP pump to: o spot cement in coil tubing string (if using cement spotting tool)

    • forward circulate cement if batching larger volumes (up to 1 m3)

    • Pressure test bridge plugs (for shallow wells)

    • Reverse circulate to clean lines

  • Downhole Tool package - Ranges from 4.5”-7”

    • Casing Scraper o J’Latch Packer

    • Casing Collar Locator

    • Cement Spotting Tool (Figure 4)

    • Baker 110/120 Hydraulic Setting Tool

    • Shear Sub and Connector

    • Coil Connector

    • Associated redress kits

  • 1m3 (6.3 BBL) Water Storage Tank

  • Bulk Sales on Cement and Bridge Plugs

  • Varsol Bin to clean tools

  • Vice to rebuild/redress tools

  • Pressure Washer to clean trailer

  • General tool shelf

The ECAS Trailers utilize the auxiliary hydraulic systems on a coil tubing unit in order to operate its two 300L hydraulic mixing barrels (used for blending cement) and the Progressive Cavity Pump (used for spotting cement into the coil, pressure testing shallow wells, or forward circulating cement by tying into the side iron). When mixing the pre-determined cement volume, the operator will measure then fill the mixing barrel with water and batch in the selected class of cement. From there the hydraulic motor head will drive (spin) the mixing barrel paddles, blending the cement. After the cement has been tested by a densometer to ensure the cement quality, the cement is then fed into a trough system which feeds the Progressive Cavity Pump (PCP). The PCP is capable of pumping up to 150L/min and pushes the cement into the coil string which is now ready to RIH and spot the cement on top of the bridge plug.